Work Order - Production Resources and Tools (PRT) Tab

Modified on Tue, 12 Jul, 2022 at 8:03 AM

Introduction

This Work Order tab shows any Production Resources and Tooling assigned to the Order. This typically can include tooling and Measurement Points, where the associated Operation with a FL or Equipment.

Production Resources and Tools (PRT) Tab

The following is an example of the tab showing a test tool:


The following screen fields and controls are defined, where not documented they are considered self explanatory or are explained elsewhere:

Field/ ControlExplanation/ Use
Type to FilterFilter the PRT list.
PRT ObjectDrill down to the PRT object - Equipment or Measurement Point.