Measurement Entry - Single

Having chosen to create a Measurement entry from a Measurement Point the following screen is displayed for reading entry:

Enter the Reading, Date and Time and Text as required, and then Save the Entry:

Note that the ability to associate with an Order and Operation depends on configuration settings and whether the entry was initiated from an Order PRT screen.

Linear Data Section

The information maintained in this section is shown where the Measurement Point is set up in SAP as a linear asset, linear asset is switched on in BlueWorx administration and the entry is not initiated from an Order:

The start and End Points and Offset 1 and 2 sub-sections are adopted from the primary object and can be edited. 


This functionality was introduced in Support Pack 11. For more information on linear assets in BlueWorx see: Linear Asset Management

Measurement Entry - Multi

Having selected one or more Measurement Points from the Measurement List the following screen is displayed for reading entry:

Enter the Reading, Date and Time as required, and then Save the Entries:

Note that using the pencil icon you can drill into the detailed screen for the entry and review/ maintain additional details like Text.